
Add to Cart
Product Description
Wet pan mill for gold plant is a new mill, small investment, high yield, the production cost is low, good benefits.The wet pan mill is named by the diameter of roller. Φ1300,Φ 1350,Φ 1400,Φ 1500,Φ 1600 is suitable for selection of iron ore, molybdenum ore ,lead ore ,zinc ore, antimony ore and so on. Φ 850, Φ 900, Φ 1000,Φ 1100,Φ 1200 is suitable for selection of gold ore
Working Principle
The wet pan mill for gold grinding repeatedly squeeze and mill gold ore through the weight of the wheels until the gold ore has been crushed completely. And then add 1 kg mercury into the water . Meantime, every 5-10 minutes, add gold ore to the machine. After 24 hours, recycle mercury. Then pack mercury with big density of cloth. Twist the cloth and let the mercury come out. The gold will be left in the cloth.
Main Features of Wet Pan Mill
1.Easy installation and maintenance
2.Low consumption
3.Low production cost
4.Low investment
5.High production capacity
6.High efficiency
Spare parts
Technical parameters
Model | Type(mm) | Max feed size(mm) | Capacity(t/h) | Power(Kw) | Weight(ton) |
1600 | 1600x350x200x460 | <25 | 1-2 | Y6L-30 | 13.5 |
1500 | 1500x300x150x420 | <25 | 0.8-1.5 | Y6L-22 | 11.3 |
1400 | 1400x260x150x350 | <25 | 0.5-0.8 | Y6L-18.5 | 8.5 |
1200 | 1200x180x120x250 | <25 | 0.25-0.5 | Y6L-7.5 | 5.5 |
1100 | 1100x160x120x250 | <25 | 0.15-0.25 | Y6L-5.5 | 4.5 |
1000 | 1000x180x120x250 | <25 | 0.15-0.2 | Y6L-5.5 | 4.3 |
Packaging and shipping
You May Also Like
Ball Mill Jaw Crusher Hammer Crusher
2-Roller Crusher Cone Crusher Impact Crusher
Company information
FAQ
Q1: Are you trading company or manufacturer?
A: We are factory.
Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.
Q4: What Information should customers give us, So that we can be able to provide you suitable quotation and service.
What minerals are you separating?
What's the maximum size of your raw minerals?
How much capacity do you need per hour for your project?